Populating the Source Model - Data Download
- 2 Minutes to read
- Print
- DarkLight
- PDF
Power user access is required for these steps.
Data Download is a Type option on the Calculation page (accessed via the Model task and Calculation subtask).
Select the Download Data (shown below) type, which will be executed when the Calculation is run. Dynamic Planning connects to Structured Planning, Consolidation, and Reporting applications, downloads data from Structured Planning, Consolidation, and Reporting applications, and fills in the data into the Source (HACPM_Financial).
Optimization
Data downloaded from the Structured Planning, Consolidation, and Reporting application is time-consuming. We have optimized this process to keep track of the last date that data was downloaded, and to download only what has changed since the last download date. This optimization is specifically for those using Scenario partitions in the Structured Planning, Consolidation, and Reporting application. This is useful in cases where some data changes frequently (such as Budgeting data), while other data changes rarely (such as Actual data).
The Scenario partitions in Structured Planning, Consolidation, and Reporting have a "Last Process Date." Dynamic Planning uses this date to track what date needs to be downloaded.
This optimization is handled internally by Dynamic Planning and no configuration settings are required from the Power user.
Manage > Application Administration > Request Status
Selecting this option opens the Request Status page, which shows the results of processes. After running Data Download, a new entry will appear at the bottom of the table. The type of operation is shown along with the start date and time, followed by its status. If the status shown is a partial completion, such as a percentage complete, click Refresh after a few seconds to track when the operation is complete.
If the status shown is a Failure, the error message is listed.
You can also use the Audit Log under the Manage, Application Administration menu.
At this point, you now have a Source model that has been generated and contains data, you have a Target/Master model that has been created at the highest level (dimensions only), and you have defined the way that Dynamic Planning should populate the Target/Master with members, data, or both. The Target/Master model is not yet generated, does not contain members, and does not contain data.